Given :
A = 25000
P = 20000
r % = 9.6 % = 0.096
n = 12
To Find :
The time taken say t.
Solution :
We know, compound interest is given by :

Taking log both sides :

Hence, this is the required solution.
You could do this with fractions. I'll do decimals later.
d = 3/4 mile
t = 2/3 hour
r = ????
r = 3/4 // 2/3 Invert and multiply the denominator
r = 3/4 * 3/2 = 9/8 = 1 1/8
If your calculator handles fractions, you can use it to do this. If not you can change this to a decimal.
d = 3/4 = 0.75 miles
t = 2/3 hour = 0.666666666 hours.
r = ???
d = r*t
r = d/t
r = 0.75 / 0.66666667
r = 1.125 miles / hour
which gives you exactly the same answer 1.125 = 1 1/8
Answer:
m = - 5
Step-by-step Explanation:

The height of a baseball thrown from the catcher to first base is modeled by the function
, where h is the height of the ball measured in feet and t is the time since being thrown, measured in seconds
To find out height of the ball at 10 seconds, we plug in 10 for t


h(10)=4.2 feet
the height of the ball at 10 seconds= 4.2 feet
Answer:
$13.20/hr
Step-by-step explanation:
A 10% wage increase would amount to 0.10($12) = $1.20. Adding this increase to the starting rate $12/hr results in $13.20/ hr.
A faster way in which to do this is shown below:
Wages after a 10% increase = (1.10)($12/hr) = $13.20/hr