Answer:
d. multiplying units to be produced by direct materials per unit.
Explanation:
To determine the total direct material, key parameters required are the direct material cost per unit and the number of units to be produced. The product of these two parameters gives the direct material cost required for production.
For example, if there are 10 units of an item to be produced and the direct material cost per unit is $4, the direct material cost needed for production is $40 derived from the product of the number of units and the direct material cost per unit.
Therefore, the right option is d. multiplying units to be produced by direct materials per unit.
The details are important for settling on the models and patterns (designs and styles) for Zara's goods for the Upcoming few seasons.
Option-a
<u>Explanation:
</u>
The collection of data is described as the approach of objective analytical observations utilizing standard established techniques compilation, calculation and evaluation. On the basis of data obtained, a scientist will test his hypothesis. In many other situations, the collection of data is the key phase for science, regardless of the area.
Based on the information required, the method of data analysis is unique for various subject areas of study. The main aim of the collection of data is to ensure that accurate information is gathered for statistical methods so that information-driven analytical decisions can be taken.
Answer: Megabus being a late mover in the US, has allowed the company to learn from past mistakes by companies such as Greyhound, who filed for bankruptcy in the mid 90's and who lost most of it's business due to poorly maintained terminals, high prices for fares and unsafe conditions. Mega bus's advantages include fares as lows as 1 dollar, free wi-fi, stylish buses and power outlets. They Can offer these low fares since the company eliminated purchase Windows for tickets, selling tickets online only and by eliminating expensive terminal operations by dropping off and picking up riders at sidewalk stops like public bus operators. There are few disadvantages besides the fact that rising gas prices affect travel and low fare prices affect revenue if quantity is not met .
Advantages - 1. Affordable 2. Pretty scenery 3.You get what you paid for
Disadvantages-1. Uncomfortable 2. It’s Either Freezing or Sweltering 3. Odd People
2. Yes it has own Overwhelming resources and capabilities 3. Train
Explanation:
Answer:
The three main reasons that might make n-tire architectures used in online businesses are Their intuitive system structure for administrators, their layering organization of processes, and the ability to maintain data separated in two different pools.
Explanation:
Three main reasons make n-tire architecture could be used in an online business.
The first one is that its structure allows administrators to identify the problems of the webpage and focus on the matter instead of having to review all of the structure to find out what is going on.
The second reason is that its layering organization provides the best setup to reuse applications. Which in other words says that the structure itself can make it possible to apply this structure to different purposes.
The third one is that the data access and data storage pools are separated and can be reviewed as well as provide maintenance to them in different times, to keep some functionality available in the process to test it and review if it works properly instead of doing it all together and testing after the process is done.
Answer:
We will plant 165 of Crop A
Explanation:
We will compare the marginal contribution for each crop: A B
Profit: 170.00 210
cost of cultivating: 40.00 60
CM per constrain 4.25 3.50
Crop A is better regarding cultivating cost.
Now we analize the labor hours:
Profit: 170 210
Labor hours per crop 20 25
CM per constrain 8.50 8.40
Because Crop A is better at both constrain resource It will be better to plant only Crop A if possible. As assigning to Crop B will diminish the return on the scarce resourse.
We will see how much can we plant of Crop A
7400 / 40 = 185
3300 / 20 = 165
We will plant 165 of Crop A
which is the maximun we can plant at the given labor hours.