answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Pani-rosa [81]
1 year ago
15

What is the answer in linear equation for this problem 5z -2 > -6

Mathematics
2 answers:
gayaneshka [121]1 year ago
3 0
You need to solve for Z

First:
Add 2 to each side of the inequality.
You get 5z>-4

Second:
Divide both sides by 5 and get

z>-4/5

Your answer is:
z>-4/5
Or if you need it in decimal form
z>-.8
Ksju [112]1 year ago
3 0
5z-2> -6
   +2   +2
5z > -4

over 5 on both sides and then the z > -4/5 if the question wants a number line the you put it on the number line with an open circle and an arrow to the right

I hope you understand. 
You might be interested in
An oil exploration company currently has two active projects, one in Asia and the other in Europe. Let A be the event that the A
Ksivusya [100]

Answer:

0.7 ; 0.65 ; 0.115

Step-by-step explanation:

Step-by-step explanation:

P(A) = 0.5 ; P(B) = 0.3

P(not successful) = P(B') = 1 - 0.3 = 0.7 ; P(A') = 1 - 0.5 = 0.5

1.)

Both events are independent events, hence the outcome of one does not depend on the other. That is the failure of the Asian project has nothing to do with the European project.

Probability that European project isn't successful;

P(B') = 1 - P(B) = 1 - 0.3 = 0.7

2.)

Probability that atleast one of the 2 projects is successful :

P(AUB) = P(A) + P(B) - P(AnB)

P(AnB) = P(A) * P(B) = 0.5 * 0.3 = 0.15

P(AUB) = 0.5 + 0.3 - 0.15 = 0.65

3.)

Probability that only the Asian project is successful, given that atleast one of the two projects is successful :

[P(A) - P(AnB)] ÷ P(AuB)

[0.5 * 0.15] ÷ 0.65

= 0.075 ÷ 0.65

= 0.1153846

= 0.115

6 0
1 year ago
1.1 puzzle time did you hear about the trees birthday
Zigmanuir [339]

Answer:

It was a sappy one

Step-by-step explanation:

lol

6 0
2 years ago
Use the coordinates of the labeled point to find the point-slope equation of the line
koban [17]

Answer:

A. y + 1 = -2(x-2)

Step-by-step explanation:

point-slope equation is : y - y1 = m (x -x1)

remember m= slope value

the given point is (2, -1) therefore we can substitute the values in:

y + 1 = m(x -2)

now to make sure our answer is complete we will solve for the slope:

looking back at the graph, the y-intercept value is 3, therefore we have a point of (0,3) and (2, -1)

with any two points you can determine a slope.

y2 - y1 / x2 - x1

therefore :

-1 -3 / 2 - 0

-4 / 2 = -2

therefore our m value is -2

this makes the completed point-slope equation:

y + 1 = -2 (x - 2) or A

3 0
1 year ago
You are at the bottom of a mountain where the temperature is 74°F. The top of the mountain is 5500 feet above you. What is the t
mamaluj [8]

For every 1,000 feet you go up in elevation, the temperature decreases by about 3.3°F

 

Given:

Temperature at the bottom of the mountain is 74°F

The top of the mountain is 5500 feet above you

 

Change (reduction) in temperature is 3.3 X 5500 / 1000

= 18.15°F

 

Temperature at the top of the mountain is 74°F – 18.15°F

= 55.85°F

3 0
1 year ago
A bee flies at 9 feet per second directly to a flowerbed from its hive. The bee stays at the flowerbed for 13 ​minutes, and then
Usimov [2.4K]

Answer: 576 feet

Step-by-step explanation:

You have to do a little subtracting and a little interpreting to get the answer. First you must assume that the bee travels in a straight line. This is math so we can assume this is true, although thousands would disagree.

Second you must assume that because it is loaded with nectar that it travels at a slower rate (not an unreasonable assumption).

Third you have to assume that the distance there is the same distance as coming back. Again this is math. We can make this assumption.

Find the travelling time.

The bee spends 12 minutes hunting down the nectar in the flowerbed. Since it was away from the hive for a total of 16 minutes, the travelling time is

16min - 12min = 4 min

Convert the Minutes to seconds.

1 minute = 60 seconds

4 minutes = 4*60 = 240 seconds.

Find the time each way.

The total time is 240 seconds, but it is not divided evenly.

Let the time there = t

Let the time back = 240 - t

The distances are the same.

r = 6 m/s

r1 = 4 m/s

t1 = t

t2 = 240 - t

dthere = dback

d = rate * time

6 m/s *t = 4 m/s (240 - t)      Remove the brackets on the right.

6 * t = 4*240 - 4t                  Combine the like terms on the right.

6t = 960 - 4t                         Add 4t to both sides

6t + 4t = 960 - 4t + 4t          Combine

10t = 960                              Divide both sides by 10

10t/10 = 960/10                    Do the division

t = 96                                    Time going to the flower bed

Find the distance

d = ?

r = 6 m/s

t = 96 second

d = r*t

d = 6 * 96 = 576 feet Answer

5 0
1 year ago
Other questions:
  • The value of a car decreases by 20 percent per year. Mr. Sing purchases a $22,000 automobile. What is the value of the car at th
    12·3 answers
  • The weight of a soccer ball is normally distributed with a mean of 21 oz and a standard deviation of 3 oz. Suppose 1000 differen
    13·2 answers
  • For his coffee shop, Abdul wants to make a mocha-java blend that will sell for $18/kg. The mocha coffee beans sell for $20/kg, a
    10·1 answer
  • The following table shows the annual income, in dollars, and amount spent on vacation, in dollars, for a sample of 8 families.
    10·1 answer
  • Me. Jackson has an empty pyramid and an empty prism. The base of the pyramid is congruent to the base of the prism, and their he
    8·1 answer
  • Polygons are a subcategory of parallograms
    6·1 answer
  • Jake drew a kite the sketch below of a kite that he wants to make.
    5·1 answer
  • What is the product of 5.86 × 10–7 and 3.1 × 104 1. Write the expression: (5.86 × 10–7)(3.1 × 104) 2. Rearrange the expression:
    7·2 answers
  • Given TS¯¯¯¯¯¯¯ and TU¯¯¯¯¯¯¯ are midsegments, PR=18.2, TS=6.5. Find QU . A. 9.1 B. 3.25 C. 13 D. 6.5
    15·1 answer
  • 9x-(-2y)-8x-(-12y) simplify​
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!