Answer: Probability = 0.2
Step-by-step explanation:
Given data:
Mean production time = 32.20 seconds
Standard deviation = 1,05seconds
probability that a full production run will take less than 32 seconds on average to produce
= P(Xbar<32)
= P(Z<-0.8518)
= 0.2
Answer:
89.62
Step-by-step explanation:
Look at the 3rd place of decimals - this is 6 so we add one to the second place.
The question is incomplete. Here is the complete question:
Samir is an expert marksman. When he takes aim at a particular target on the shooting range, there is a 0.95 probability that he will hit it. One day, Samir decides to attempt to hit 10 such targets in a row.
Assuming that Samir is equally likely to hit each of the 10 targets, what is the probability that he will miss at least one of them?
Answer:
40.13%
Step-by-step explanation:
Let 'A' be the event of not missing a target in 10 attempts.
Therefore, the complement of event 'A' is 
Now, Samir is equally likely to hit each of the 10 targets. Therefore, probability of hitting each target each time is same and equal to 0.95.
Now, 
We know that the sum of probability of an event and its complement is 1.
So, 
Therefore, the probability of missing a target at least once in 10 attempts is 40.13%.
Answer:
Step-by-step explanation:
A car traveled at a constant speed as shown in the graph.
Distance traveled is on the y-axis and duration of travel on the x-axis.
Point A(3.5, 210) shows,
Distance traveled = 210 miles
Time to travel = 3.5 hours
So the point (3.5, 210) shows the distance traveled by the car in 3.5 hours is 210 miles.
Slope of the line = speed of the car = 
= 
= 60 mph
Now we will find the speed of the car at another point B(1, 60).
If the speed of car is same as the point B as of point A, point B will lie on the graph.
Speed of the car at B(1, 60) = 
= 
= 60 mph
Hence, we can say that point B(1, 60) lies on the graph.
Answer:
1. Minor arc
2. 152
3. major arc
4. 298
Step-by-step explanation: