answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Reika [66]
2 years ago
14

Exams are approaching and Helen is allocating time to studying for exams. She feels that with the appropriate amount of studying

, she has an 80% chance of getting an A in Marketing. She also feels that she has a 60% chance of getting an A in Spanish with the appropriate amount of studying. Given the demands on her time, she feels that she has only a 45% chance of getting an A in both classes. What is the probability that Helen does not get an A in either class?
Mathematics
1 answer:
svp [43]2 years ago
3 0

Answer: 0.05

Step-by-step explanation:

Let M = Event of getting an A in Marketing class.

S = Event of getting an A in Spanish class,

i.e. P(M) = 0.80 , P(S) = 0.60 and P(M∩S)=0.45

Required probability = P(neither M nor S)

= P(M'∩S')

= P(M∪S)'                                 [∵P(A'∩B')=P(A∪B)']

=1- P(M∪S)                               [∵P(A')=1-P(A)]

= 1- (P(M)+P(S)- P(M∩S))   [∵P(A∪B)=P(A)+P(B)-P(A∩B)]

= 1- (0.80+0.60-0.45)

= 1- 0.95

= 0.05

hence, the probability that Helen does not get an A in either class= 0.05

You might be interested in
David wants to rent a bicycle for a couple of hours to explore the city. The price of the bike rental, (P)(P)left parenthesis, P
Mars2501 [29]

Answer:

The hourly charge is $4 per hour for the first 3 hours.

The rate then drops to $2 per hour until the end of the 6th hour.  

The hourly rate drops further to $1 per hour between the 6th and 10th  hours.

The maximum price of the bike rental is $30.

Step-by-step explanation:

The slope of the graph corresponds to the hourly rate for the bike rental.

During the first three hours of the bike rental, the price increases by $4 each hour.

Between the 3rd  and 6 th hours, the slope of the graph is 2, which means the hourly rate of the bike rental is $2 per hour.

Between the 6th and 10th hours, the rate is $1 per hour.

After the 10th  hour, the price, P, stops increasing. The maximum price of the bike rental is $30.

6 0
2 years ago
Natalia is writing a recursive formula to represent the sequence 8,12,18,27 what value should she use as the common ratio in the
Marrrta [24]
Common ratio = second term / first term = 12 / 8 = 1.5
7 0
2 years ago
Read 2 more answers
Sal's Sandwich Shop sells wraps and sandwiches as part of its lunch specials. The profit on every sandwich is $2 and the profit
Ann [662]
Let
x--------> <span>the number of sandwich lunch specials sold
y-------> </span><span>the number of wrap lunch specials sold

we know that
2x+3y=1470

Part 1) </span><span>Change the equation to slope-intercept form. Identify the slope and y-intercept of the equation. Be sure to show all your work.

we know that
</span>the equation to slope-intercept form is of the form
y=mx+b
so
2x+3y=1470------> solve for y
3y=1470-2x-----> divide by 3 both sides
y=(-2/3)x+1470/3
y=(-2/3)x+490

the slope m=-2/3
the y-intercept is 490


Part 2) <span>Describe how you would graph this line using the slope-intercept method. Be sure to write using complete sentences.

</span><span>the slope is -2/3  and the y-intercept is 490

Plot the point (0,490)------>  the y-intercept.
With the slope count 3 squares to the right and 2 squares down and plot that point, which is (0+3,490-2)--------> (3,488)
Draw a line through the two points  

Part 3) </span><span>Write the equation in function notation. Explain what the graph of the function represents. Be sure to use complete sentences.

In function notation, the equation is:
f(x)=(-2/3)x+490
The graph of this function represents how the value of the function varies as the value of x varies. Looking back at the question context, this graph specifically represents how many wraps could have been sold at each number of sandwich sales, in order to maintain the same profit of $1470.</span><span>

Part 4) </span>Graph the function. On the graph, make sure to label the intercepts. You may graph your equation by hand on a piece of paper and scan your work or you may use graphing technology

using a graph tool
see the attached figure

Part 5) Suppose Sal's total profit on lunch specials for the next month is $1,593. The profit amounts are the same: $2 for each sandwich and $3 for each wrap. In a paragraph of at least three complete sentences, explain how the graphs of the functions for the two months are similar and how they are different

we have that
2x+3y=1593
3y=1593-2x--------> y=(-2/3)x+531
slope=(-2/3)
y intercept=531
therefore
similarities : same slope
differences : y intercepts are different.
<span>This is basically telling me that the lines are parallel lines because they have the same slope.
</span>
6) Below is a graph that represents the total profits for a third month. Write the equation of the line that represents this graph. Show your work or explain how you determined the equations

Select two points on the line and write down their coordinates

Let
 A( 0,300)  B (450,0)
a) find the slope
m=(y2-y1)/(x2-x1)----> m=(0-300)/(450-0)----> m=-2/3
b) with the slope m=(-2/3) and the point A (0,300)
y-y1=m*(x-x1)-----> y-300=(-2/3)*(x-0)----> y=(-2/3)x+300

the answer Part 6) is
y=(-2/3)x+300

7 0
2 years ago
At middle Avenue school, 1/30 of the students are on track team. The track coach offered to buy pizza or subs for everyone on th
atroni [7]
3/5 of the students ate pizza
4 0
2 years ago
Theresa has hired Chuck and Diana to paint a fence. Diana can paint 150 fence posts in the same time it takes Chuck to paint 130
Alenkasestr [34]

Answer: Chuck can paint 65 posts per hour.

Step-by-step explanation:

The data we have here is:

Diana can paint 150 fence posts in a time T

Chuck can pint 130 fence posts in a time T.

In one hour, Diana can paint 10 more fence posts than Chuck.

If D is the hourly rate of Daian, and C is the hourly rate for Chuck, we have:

D = 150/T

C = 130/T

D = C + 10

we can replace the last equation in the first one and geT:

C + 10 =150/T

C = 130/T

Now we can replace the bottom equation in the above one:

130/T + 10 = 150/T

10 = 150/T - 130/T =  20/T

T*10 = 20

T = 20/10 = 2

So T is 2 hours, then whe have:

D = 150post/2hours = 75 posts per hour.

C = 130 posts/2hours = 65 posts per hour.

4 0
2 years ago
Other questions:
  • "Which pairs of angles in the figure below are vertical angles? Check all that apply.
    11·2 answers
  • JL is a diameter of circle K. if tangents to circle K are construvted through points L and J, what relationship would exist betw
    5·1 answer
  • A candy store is building a display with two rectangular prism.The base of each prism is a square with an edge length of 5 inche
    9·1 answer
  • Hi, I need help asap.
    12·1 answer
  • Use Part 1 of the Fundamental Theorem of Calculus to find the derivative of the function. g(x) = 7x u2 − 1 u2 + 1 du 6x Hint: 7x
    5·1 answer
  • A customer wants you to enlarge a photo to 2 /34 its current height. The photo’s current height is 3 1/4 inches. What should its
    14·2 answers
  • In ΔSTU, the measure of ∠U=90°, TU = 6.6 feet, and US = 2.3 feet. Find the measure of ∠S to the nearest tenth of a degree.
    11·2 answers
  • Money Spent on Road Repair A politician wishes to compare the variances of the amount of money spent for road repair in two diff
    8·1 answer
  • Arnav was 1.5 m tall. In the last couple of years, his height has increased by 20% percent.
    7·2 answers
  • You are constructing a concrete landing pad for a helicopter. You have 4704 cubic feet of concrete
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!