Given that mean=56.1 and standard deviation=8.2, P(x>67.5) will be found as follows:
The z-score is given by:
z=(x-μ)/σ
thus the z-score will be given by:
z=(67.5-56.1)/8.2
z=11.4/8.2
z=1.39
thus
P(z=1.39)=0.9177
thus:
P(x>67.5)=1-P(z>0.9177)
=1-0.9177
=0.0823
Answer: A. 0.0823
In order to find the percent error, we need to first find the difference between what was expected and what is actually costed. We do this by subtracting:

So now we know that the expected amount was off by $63. To find the percent error, we need to take this $63, and divide it by the amount that was estimated. Let's do that now:

However this is in decimal form. We need to multiply by 100 in order to get it in a percent:

Now we know that
the percent error of the hospital bill estimate is 13.64%.
Fifty-two billion, six hundred and thirty-four million, two hundred and seventy-five thousand, three hundred and nine.
The answer is most definitely b.
Answer:
Step-by-step explanation:
A) The constant of proportionality in terms of minutes per bracelet is
15/3 = 5 minutes per bracelet
B) The constant of proportionality represents man hour rate
C) let k = constant of proportionality, t = time in minutes and b = number of bracelets produced. Therefore,
t = kb
D) the constant of proportionality in terms of number of bracelets per minute is
3/15 = 1/5
E) The constant of proportionality represents production rate
F) let k = constant of proportionality, t = time in minutes and b = number of bracelets produced. Therefore,
b = kt
G) The constants of proportionality are reciprocals
H) Two equations are equivalent if they have the same solution. They are not equivalent. By inputting the different values of k, the solutions will always be the same. Therefore, they are equivalent.