Answer:
1) Choose Slide
2) Transition Tab
3) Transition To This Slide
4) Select New Transition
Explanation:
There are 4 main steps that Evie needs to take in order to accomplish this. First, she needs to choose the slide that she wants to apply the transition to. Secondly, she needs to click on the Transitions Tab at the top of the application. Thirdly, she needs to go to the "Transition to this Slide" section of the tab. Lastly, she needs to choose one of the available animation/transitions from the list of options. This will apply that transition effect to that slide, so that when she switches to that slide it performs the animation.
Answer:
It will be a java code.
Explanation:
import java.util.Scanner;
public class StringInputStream {
public static void main (String [] args) {
Scanner inSS = null;
String userInput = "Jan 12 1992";
inSS = new Scanner(userInput);`
String userMonth = "";
int userDate = 0;
int userYear = 0;
/* Your solution goes here */
System.out.println("Month: " + userMonth);
System.out.println("Date: " + userDate);
System.out.println("Year: " + userYear);
return;
}
}
Answer:

Explanation:
Given
Power at point A = 100W
Power at point B = 90W
Required
Determine the attenuation in decibels
Attenuation is calculated using the following formula

Where
t and
t


Substitute these values in the given formula




<em>(Approximated)</em>
Answer:
Mercury, rontgen rays, etc.
Explanation:
There are lots of answers to this question, hope these two help.
Additional resource needed for the projects
Additional time needed for the project
<u>Explanation:</u>
In any project handing their will expected diversion and add on requirement, so to complete a project additional time and additional resource is required to finish a project.
As advice due the project details, end user has keep enough buffer for deviations on resource of man power and additional times taken to finish the project.
While design the project each scope of work is measure with additional time to complete the task
Each scope of work is considered as task in project management.