Answer: 0.31
Step-by-step explanation:
Let A denotes the event of Tampa Bay Buccaneers will score a touchdown on their opening drive and B denote the event that their defense will have 3 or more sacks in the game.
Given : P(A)=0.14 P(B) = 0.31 P(A or B)=0.14
Formula : P(A and B)= P(A) + P(B) - P(A or B)
Now, the probability that they will both score a touchdown on the opening drive and have 3 or more sacks in the game will be :-
P(A and B)= 0.14 + 0.31 - 0.14=0.31
Hence, the required probability : 0.31
The picture in the attached figure
we know that
Area of circle=pi*r²
area of the shaded region=364*pi cm²
area of the shaded region=area of the outer circle -area of the<span> inside circle
</span>area of the outer circle=pi*[2x]²----> 4*x²*pi cm²
area of the inside circle=pi*6²------> 36*pi cm²
364*pi=4*x²*pi-36*pi------> 364=4*x²-36
4*x²=364+36-----> 4*x²=400
x²=400/4----> x²=100
x=10 cm
the answer isx=10 cm
Answer:
18.67% of bills are greater than $131
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What proportion of bills are greater than $131
This proportion is 1 subtracted by the pvalue of Z when X = 131. So



has a pvalue of 0.8133
1 - 0.8133 = 0.1867
18.67% of bills are greater than $131
Answer:
i think its the second one because if you multiply a number by a decimal with a value lower than 1, then the number will go down, but im not positive
Step-by-step explanation:
For this case, the first thing we are going to do is write the generic equation of motion for the vertical axis.
We have then:

Where,
- <em>g: acceleration of gravity
</em>
- <em>vo: initial speed
</em>
- <em>h0: initial height
</em>
For the first body:

For the second body:

By the time both bodies have the same height we have:


Rewriting we have:



Clearing time:

Answer:
it takes 18.31s for the two window washers to reach the same height