Answer:
Z
Step-by-step explanation:
The height needs to start at 96
All you would do is times 12 by .15 or 15% you get 1.8 then all you do is 12 minus 1.8 you get $10.20 that is the price of a discounted pizza
I hope this helps
To determine the cost of each meter of the ribbon, we divide the cost for 5 meters of ribbon by 5. That is,
x = $4 / 5
where x is the cost of each meter. Simplifying will give us an answer of $0.8/m. Converting this to per mm.
($0.8/m) x (1 m/ 1000 mm)
= $0.0008/mm
Answer: (-4,-8)
Step-by-step explanation: I got a 100% on the quiz
1. Consider square ABCD. You know that

then

2. Consider traiangle AED. F is mipoint of AE and G is midpoint of DE, then FG is midline of triangle AED. This means that

3. Consider trapezoid BFGC. Its area is
where h is the height of trapezoid and is equal to half of AB. Thus,

4.

5. Note that angles EGC and CGD are supplementary and

Then

Answer: 