answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
jolli1 [7]
1 year ago
15

Homer and Mike were replacing the boards on​ Mike's old deck. Mike can do the job alone in 1 hour less time than Homer. They wor

ked together for 3 hours until Homer had to go home. Mike finished the job working by himself in an additional 5 hours. How long would it have taken Homer to fix the deck​ himself?
Mathematics
1 answer:
DiKsa [7]1 year ago
5 0
For this case, the first thing we are going to do is define variables.
 We have then:
 x: number of hours it takes Homer to finish work alone.
 They worked together for 3 hours until Homer had to go home:
 3  \frac{1}{x} + 3  \frac{1}{x-1}
 Mike finished the job working by himself in an additional 5 hours:
 3  \frac{1}{x} + 3  \frac{1}{x-1} + 5 \frac{1}{x-1} = 1



 From here, we must clear the value of x.
 We then have to multiply both sides by x (x-1):
 3 (x-1) + 3x + 5x = x (x-1)

 Rewriting we have:
 3x - 3 + 3x + 5x = x ^ 2 - x

 x ^ 2 - 12x + 3 = 0
 The solutions to the equation are:
 x1 = 0.25 (discarded)

x2 = 11.75
 Answer:
 
it has taken Homer to fix the deck himself about:
 
x2 = 11.75 hours
You might be interested in
Ephemeral services corporation (esco) knows that nine other companies besides esco are bidding for a $900,000 government contrac
EastWind [94]

Answer:

c. $100,000

Step-by-step explanation:

Calculation of the expected net profit of Ephemeral services corporation

Since we are been told that 9 other companies besides esco are as well bidding for the $900,000 government contract, it means we have to find the expected net profit by dividing 1 by 9×$900,000 .Thus ESCO can only expect to cover its sunk cost.

Hence ,

E(X) = (1/9) × $900,000

E(X)=0.111111111×$900,000

E(X)= $100,000

Therefore the expected net profit would be $100,000

4 0
1 year ago
This relationship is given by the equation, v = gt. In this equation, g is the acceleration due to gravity, t is the number of s
DENIUS [597]

v=gt,

Initial value when time t=0, v=g*0=0.

t=0 s, v=0 m/s means that object’s initial velocity 0 m/s.

v=gt, and g is a constant g=9.8 m/s². We can write v=9.8*t.

Rate of change 9.8 means the acceleration due to gravity is 9.8 m/s².

Answer: C. The initial value is 0. That means that object’s initial velocity 0 m/s. The rate of change is 9.8. That means the acceleration due to gravity is 9.8 m/s2.

4 0
1 year ago
Estimate the indicated probability by using normal distribution as an approximation to the binomial distribution. Estimate P(6)
lianna [129]

Answer:

P(6) = 0.6217

Step-by-step explanation:

To find P(6), which is the probability of getting a 6 or less, we will need to first calculate two things: the mean of the sample (also known as the "expected value") and the standard deviation of the sample.  

Mean = np

Here, "n" is the sample size and "p" is the probability of the outcome of interest, which could be getting a heads when a tossing a coin, for instanc

So, Mean = n × p = (18) ×(0.30) = 5.4

Next we we will find the standard deviation:

Standard Deviation = \sqrt{npq}

n = 18  and  p = 0.3   "q" is simply the probability of the other possible outcome (maybe getting a tails when flipping a coin), so   q = 1 - p

Standard Deviation =\sqrt{npq} = \sqrt{(18)(0.3)(0.7)}  

                                                            = 1.944

Now calculate the Z score for 6 successes.  

Z = ( of successes we're interested in - Mean) ÷ (Standard Deviation)

=(6-5.4)  ÷ (1.944) = 0.309

we have our Z-score, we look on the normal distribution and find the area of the curve to the left of a Z value of 0.309.  This is basically adding up all of the possibilities for getting less than or equal to 6 successes.  So, we get 0.6217.

5 0
1 year ago
If y varies directly as x, and y is 400 when x is r and y is r when x is 4, what is the numeric constant of variation in this
otez555 [7]

Answer:

10

Step-by-step explanation:

If there is a direct relation between two variables x and y then it can be represented as

y = kx ,

where y is dependent variable

x is  independent variable

k is constant of variation

_____________________________

First condition

y = 400

x = r

using y = kx then relationship will be

400 = kr

finding k here

k = 400/r

Second condition

y = r

x = 4

using y = kx then relationship will be

r = 4k

finding k

k = r/4

since  in both condition equation is same

thus, value of k will also be same

thus,

400/r = r/4

=> 400*4 = r*r

=> 1600 = r^2

\sqrt{r^{2} }  = \sqrt{1600} \\r = 40

Thus, 40 is the value of r

k = r/4 = 40/4 = 10

Thus, constant of variation is 10 which is correct choice.

To cross validate

k = 400/r = 400/40 = 10

7 0
1 year ago
Read 2 more answers
A baby wriggled so much that weighing him at the clinic was a problem. So the doctor held the baby and stood on a scale. Then th
Pepsi [2]
X = <span>weight of the baby.
y = </span>weight of the doctor.
z = weight of the nurse.

x + y = 78 so y = 78 - x
x + z = 69 so z = 69 - x
x + y + z = 142

substitute y = 78 - x and z = 69 - x into x + y + z = 142

x + y + z = 142
x +78 - x + 69 - x = 142
-x + 147 = 142
-x = - 5
 x = 5

answer

<span>the weight of the baby was 5 kg</span>
6 0
2 years ago
Read 2 more answers
Other questions:
  • Graph the six terms of a finite sequence where a1 = 5 and r = 1.25
    9·1 answer
  • Mr. Malloy wants to make sure Amo and Javier get the best possible grade after five tests and can either give a grade based on t
    8·2 answers
  • In a batch of 100 cell phones, there are, on average, 5 defective ones. if a random sample of 30 is selected, find the probabili
    5·1 answer
  • In order to meet ADA (Americans with Disabilities Act) requirements, a wheelchair ramp must have an angle of elevation of no mor
    11·2 answers
  • Damian has a spinner. He spun the arrow 60 times and it landed on green 12 times.
    10·1 answer
  • The Scholastic Aptitude Test (SAT) is a standardized test for college admissions in the U.S. Scores on the SAT can range from 60
    7·1 answer
  • Triangle JKL is graphed on the coordinate plane below. On a coordinate plane, triangle J K L has points (1, 2), (4, 2), (3, 5).
    5·2 answers
  • A set of middle school student heights are normally distributed with a mean of 150150150 centimeters and a standard deviation of
    6·1 answer
  • Which expression is equivalent to ( xy -6)2 for all values of x and y where the expression is defined?
    5·2 answers
  • There are 7 fourth-grade classes at Grant Elementary. Each class has 28 students. About how many students are in the fourth grad
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!