Answer:

Step-by-step explanation:
Let, the number of cans collected by Shane = x.
So, the number of cans collected by Abha = x + 178.
Since, at least 2000 cans are required to be collected.
Thus, we have the inequality,
Number of cans by Shane + Number of cans by Abha ≥ 2000.
i.e. 
i.e. 
Thus, the required inequality is
.
A book is sold in Belize for 80.39 Belize dollars.
In Brazil, it sells for 63.65 Brazilian reals.
The exchange rate of US Dollars to Belize Dollars is 1:1.9246
<span>The exchange rate of US Dollars to Brazilian Real is 1:1.7880
</span>
If we convert the two into dollars,
Belize Dollars
1 : 1.9246 = X : <span>80.39
1.9246X = 80.39
X = $ 41.77
</span>Brazilian Real
1 : 1.7880 = X : 63.65 <span>
</span>1.7880X = 63.65 <span>
X = $ 35.60
</span>
Difference = $ 41.77 - $ 35.60
Difference = $ 6.17
<span>So, in Belize the book is more expensive by $ 6.17</span>
,Okay, so here is how to calculate the amount of the trade discount:
I: $149,500 * .10 (10%) = 14,950 (this is the 10% discount)
149,500 - 14,950 = 134,550 (how much it costs with a 10% discount)
II: 134,550 * .5 (5%) = 6727.50
134,550 - 6727.50 = 127,822.50
III: 127,822.50 * .4 (4%) = 5112.90
The amount of the trade discount is: $14,950 + $6727.50 + $5112.90 = 26,790.40 dollars.
The converse of the hinge theorem is also true: If the two sides of one triangle are congruent<span> to two sides of another triangle, and the third side of the first triangle is greater than the third side of the second triangle, then the included angle of the first triangle is larger than the included angle of the second .</span>
------------------------------------------------------------------
Push Mower
------------------------------------------------------------------
It takes 5 hours to complete the job
1 hour = 1/5 of the job
------------------------------------------------------------------
Riding Lawn Mower
------------------------------------------------------------------
It takes 3 hours to complete the job
1 hour = 1/3 of the job
------------------------------------------------------------------
Push Mower + Riding Lawn Mower
------------------------------------------------------------------
1 hour = 1/5 + 1/3
1 hour = 3/15 + 5/15
1 hour = 8/15 of the job.
------------------------------------------------------------------
Calculate time needed to complete
------------------------------------------------------------------
8/15 of the job takes 1 hour
8/15 of the job = 1 hour
------------------------------------------------------------------
Divide by 8/15 on both side
------------------------------------------------------------------
8/15 ÷ 8/15 of the job = 1 ÷ 8/15 hour
Whole of the job = 1 x 15/8 hours
Whole of the job = 15/8 hours
Whole of the job = 1 7/8 hours
------------------------------------------------------------------
Answer: 1 7/8 hours
------------------------------------------------------------------