Answer:
Reference The length of time Y necessary to. ... construction of houses has an exponential distribution with mean 10 hours. The formula C = 100 + 40Y + 3Y 2 relates the cost C of completing this operation to ... Find the mean and variance of C. ... The length of time necessary to complete a key operation in the construction of ...
Step-by-step explanation:
Answer:
The probability that it will take more than 10 minutes for the next student to arrive at the library parking lot is 0.0821.
Step-by-step explanation:
The random variable <em>X</em> is defined as the amount of time until the next student will arrive in the library parking lot at the university.
The random variable <em>X</em> follows an Exponential distribution with mean, <em>μ</em> = 4 minutes.
The probability density function of <em>X</em> is:

The parameter of the exponential distribution is:

Compute the value of P (X > 10) as follows:


Thus, the probability that it will take more than 10 minutes for the next student to arrive at the library parking lot is 0.0821.
Answer:option B & D are correct
Step-by-step explanation:
Given options are
A B C D E
Tether ball pole shadow 1.35 1.8 3.75 0.6 2
Flagpole shadow 3.4 4.08 8.35 1.36 4.8
Ratio of corresponding height & shadows should be same
3 meter tall tether ball pole and a 6.8 tall flagpole
=> Ratio = 6.8/3 = 68/30 = 34/15
A - 3.4/1.35 = 340/135 ≠ 34/15( 306/135)
B - 4.08/1.8 = 408/180 = 34/15 = 34/15 ( Correct option)
C 8.35/3.75 = 835/375 = 167/75 ≠ 34/15( 170/75)
D 1.36/0.6 = 136/60 = 34/15 = 34/15 ( Correct option)
E 4.8/2 = 48/20 = 12/5 = 36/15 ≠ 34/15
option B & D are correct
Regular size saves $0.0003 per gram I think
someone pls fact check me