A) the starting point is in quadrant Q because the x-value is negative, while the y-value is positive. The finishing point is in quadrant S because the x-value is positive, while the y-value is negative.
B) The points are connected by a straight line, so you don't have to wander off. By the way, the checkpoint is in Quadrant P.
Step-by-step explanation:
PARA ENCONTRAR CUÁNTO MIDE CAD LADO SE DIVIDE EL PERÍMETRO
ENTRE 4 LADOS
l = 1.28 in
LOEGO ENCUENTRAS EL RADIO DE LA PIRÁMIDE
<em>r</em> = 2.55 in
USANDO LA FÓRMULA
V = 4(1.28 in)(2.55 in)(2.7 in)/6 = 
To answer this question, an assumption must be made, that Eva spends 8 hours a day working. If this is the case, then Eva will complete jobs w, x, and v on day one, for a total of six hours. Since the next job (y) requires 4 hours, she will spend two hours working that day, leaving 2 more hours to go on that job. The next day she will spend 2 hours finishing job y, completing it, and finish the longest job z (hours) that day. This means she had 4 jobs on day one, and 2 jobs on day 2 for and average of 3 jobs per day.
This answer assumes an 8 hour work day, and that Eva can start a job she cannot finish that day.
convert yards to feet and minutes to seconds
1yard=3ft
16.8yards times 3ft/1yd=50.4ft
1minute=60 seconds
12minutes times 60seconds/1min=720seconds
feet per second=50.4ft/720sec=0.07ft/sec
answer is 0.07ft/sec
Answer:
448 fl oz
Step-by-step explanation:
there are 7 days in a week. 4*7 is 28
28 pints to ounces is 448 fl oz