answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
olchik [2.2K]
2 years ago
8

Students are going through a three-step process to obtain their ID cards. Each student will spend 2 minutes at the registration

desk before going to one of three cashiers to pay a fee for the ID card. After that, he/she will visit one of four ID processing stations to have his/her picture taken and ID card printed. Visits to the cashier and ID processing station take 10 and 20 minutes respectively. If the demand rate is 0.125 student per minute, how long does it take to process 20 students assuming the system is full?
A. 100 minutes

B. 152 minutes

C. 160 minutes

D. 184 minutes
Mathematics
2 answers:
kondaur [170]2 years ago
6 0

Answer:

C. 160 minutes

Step-by-step explanation:

The calculation to be made will be to process 20 students

We have, according to the exercise, the following data:

For process 1: Registration table, Number of servers = 1, Time spent = 2 minutes

For process 2: cashier, number of servers = 3, time spent = 10 minutes

For process 3: ID processing station, number of servers = 4, time spent = 20 minutes

Demand rate = 0.125

To solve it, we will look for the capacity that the server has of the previously mentioned processes, calculating the following:

Capacity = Number of students served per minute

We can say that at the registration table we observe:

Time needed to serve 1 student = 2 minutes

Capacity = 0.5 students per minute

With the cashier we analyze the following:

Time needed to serve 1 student = 10 minutes

Number of servers = 3

Capacity = 0.3 students per minute

ID processing station

Time needed to serve 1 student = 20 minutes

Number of servers = 4

Capacity = 0.2 students per minute

When comparing the processes, it is definitely found that the bottleneck is the ID processing station, where it takes more time to serve a student, which leads us to infer that the capacity of the process is comparable to the capacity of the process bottleneck

Process capacity = 0.2 students per minute

Given, demand rate = 0.125 students per minute

We observe that the demand rate is less than the capacity of the process, therefore we can infer that the number of students served during each minute is the same as the demand rate.

In this way we find that:

Number of students served per minute = 0.125

Time needed to serve 1 student = 1 / 0.125 = 8 minutes

Time needed to serve 20 students = 8 x 20 = 160 minutes.

We conclude that the answer is that it will take 160 minutes to serve 20 students.

.

goldfiish [28.3K]2 years ago
6 0

Answer:

C) 160 minutes

Explanation:

Given:

Time spent at registration desk = 2mins

Time spent at the cashier = 10 mins

Time spent at the ID processing station = 20 mins

Number of registration desk = 1

Number of cashiers = 3

Number of ID processing stations = 4

Let's calculate the capacity of each process using the expression: number of agents / process time

Therefore,

Capacity of registration desk =

\frac{1}{2} = 0.5 students per min

Capacity of cashiers =

\frac{3}{10} = 0.3 students per min

Capacity of ID processing stations =

\frac{4}{20} = 0.2 students per min

The process capacity is equal to the bottleneck process. Here, the bottleneck process is the process with the longest time per minute which is the ID processing station.

Therefore, given a rate of 0.125 student per min and Process capacity of 0.2 student per min, we'll take 0.125 as the number of students per minute since it is lower than the process capacity.

Therefore, time taken to serve one student = \frac{1}{0.125} = 8mins

Time taken to serve 20 students would be = 20 * 8 = 160 minutes

You might be interested in
ind the slope and y-intercept for the two linear functions. A 2-column table with 5 rows. Column 1 is labeled x with entries neg
Liula [17]

Answer:

-1/4

-4

3/2

1

got it right on edge 2020

Step-by-step explanation:

9 0
2 years ago
Read 2 more answers
In a certain country, a letter up to 1 ounce requires postage in the amount of $0.42, and each additional ounce (or fraction of
kati45 [8]
The answer is $7.14 is wunt josiah pay
8 0
2 years ago
Read 2 more answers
Sociologists studying the behavior of high school freshmen in a certain state collected data from a random sample of freshmen in
timurjin [86]

Answer:

C

Step-by-step explanation:

Stay safe hope this helps

5 0
2 years ago
Read 2 more answers
A tin of paint covers a surface area of 50m2. Each tin costs £5.60. The entire surface of a solid cylindrical rod with diameter
bearhunter [10]

the answer is in the picture

5 0
1 year ago
Question Number 12 You are a landscaper working on the design of a parking lot in a new shopping center. You are measuring the l
vovikov84 [41]

Answer:

Length\: of\: D=37\frac{3}{16}  \:feet

Step-by-step explanation:

The following are the given information:

  • The handicapped spot, which is 10\frac{1}{16} feet wide and next to the curb.
  • The other three spots are 8\frac{3}{8} feet wide.
  • There are 4 dividing lines between the spots, and each measures \frac{1}{2} foot.

The Median D therefore will be a sum of the following:

  • The width of the Handicapped Spot
  • 3 X The width of the other spots
  • 4 X The width of the dividing line

= 10\frac{1}{16} + (3 X 8\frac{3}{8})+(4 X\frac{1}{2})\\=\frac{161}{16} +  \frac{3 X 67}{8}+\frac{4}{2}\\=\frac{161}{16} +  \frac{201}{8}+\frac{4}{2}\\=\frac{161+402+32}{16}\\=\frac{595}{16}\\Length\: of\: D=37\frac{3}{16}  \:feet

7 0
2 years ago
Other questions:
  • rita traveled 1250 miles in the first 3 days of her trip. at this rat how long will it take her to travel 1875?
    5·2 answers
  • el dividendo en una division exacta es toma el valor de 240 halle el valor del cociente si el divisor es una unidad menor que el
    13·1 answer
  • Consider a picnic. if you want to buy enough hot dogs and buns without having any left over, you need to balance the number of p
    7·1 answer
  • Point F is on circle C. What is the length of line segment GF? 12.5 units 15.0 units 17.5 units 20.0 units
    15·1 answer
  • A construction contractor received two deliveries of building supplies from a lumberyard. The two deliveries included 10 boxes o
    7·1 answer
  • In triangle ABC, m∠BAC = 50°. If m∠ACB = 30°, then the triangle is triangle. If m∠ABC = 40°, then the triangle is triangle. If t
    7·2 answers
  • Helpppppppppppppppppppppppppppppppppppppppppppppppppppppppppp
    9·2 answers
  • A customer/member owes $10.51 and pays $50.00 in cash. The change due is $39.49. Provide the amount owed using the smallest numb
    9·1 answer
  • Which is the graph of 2x – 4y > 6? On a coordinate plane, a dashed straight line with a positive slope goes through (negative
    8·3 answers
  • Which function shows the combined cost in dollars, y, for three shipments with x number of chargers and tablets?
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!