9×2=18. add the tow zeros like this 9×2=18+00=1,800
Answer: 6 hours
Step-by-step explanation:
Given, Tim and Jim are working on a school project together.
Tim takes 10 hours to complete the school project.
If Jim worked alone, it would take him 15 hours
Let t be the time they both take if they work together.
Then, 

So, it will take<u> 6 hours</u> to complete the school project together .
Since there are 6 students out of which one needs to be selected, the principal chose two die on which there are six numbers each numbered from 1 , 2, 3, 4, 5, 6.
Since there are two dice, the total possible outcome is 36.
Hence, the probability of getting one number each is 1/36
Hence, the principal used a fair method because each result is an equally likely possible outcome.
Option B is correct.
Vertex form 1/2(0), where 0 replaces x as a number the variable x is.
The vertex is (0,0).
flavored nachos, so as to deliver it with proper mentioned reason.Hence,
Hence, This study is not well designed because formulas A and B are not compared with the original formula.
Step-by-step explanation:
As mentioned above, the cmpany needs to check the new upcoming flavors of nachos i.e., A and B and is said that it should meeet the requirement of getting better from their regular ones as well. For this, the company must release the two new nachos flavors A and B, irrespective of quantity and let the customers compare it with along the regular nachos.This demands for a fact that the 50 nachos been tasted should be compared with the regular flavored nachos so as to meet the demand getting better than the usual ones. For this to happen,the above mentioned study describes it the best.
This is the correct explanation for the above question