answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Tatiana [17]
2 years ago
6

Profit is the difference between revenue and cost. The revenue, in dollars, of a company that manufactures cell phones can be mo

deled by the polynomial 2x2 + 55x + 10. The cost, in dollars, of producing the cell phones can be modeled by 2x2 – 15x – 40. The variable x represents the number of cell phones soldProfit is the difference between revenue and cost. The revenue, in dollars, of a company that manufactures cell phones can be modeled by the polynomial 2x2 + 55x + 10. The cost, in dollars, of producing the cell phones can be modeled by 2x2 – 15x – 40. The variable x represents the number of cell phones sold. What expression represents the profit, and what is the profit if 240 cell phones are sold
Mathematics
1 answer:
stira [4]2 years ago
5 0

Answer:

  • Expression for Profit is 70x+50
  • Profit when 240 phones are sold is $16,850

Step-by-step explanation:

Revenue function (R(x)) is given as  R(x)=2x^2+55x+10

Cost function (C(x)) is given as  C(x)=2x^2-15x-40


To find the expression for profit, we use Revenue - Cost = Profit

<em>We simply substitute the functions given above into this word equation.</em>

<em><u>Let's call Profit as P(x).</u></em>

P(x)=R(x)-C(x)\\P(x)=2x^2+55x+10-(2x^2-15x-40)\\P(x)=2x^2+55x+10-2x^2+15x+40\\P(x)=70x+50

The expression for Profit function is  70x+50


<em><u>Since x represents the number of phones sold, and we want to find the </u></em><em><u>PROFIT</u></em><em><u> when number of phones sold is 240, we plug in 240 into x in the profit function just found above. </u></em>Thus:

P(x)=70x+50\\P(240)=70(240)+50\\P(240)=16,850

Thus the profit if 240 phones are sold is $16,850

You might be interested in
What is the relationship between two lines whose slopes are −8 and 1 8 ?
zavuch27 [327]

Answer:

They are perpendicular lines

Step-by-step explanation:

If one line has slope -8 and the other one has slope 1/8, they must be perpendicular to each other because the condition for perpendicular lines is that the slope of one must be the "opposite of the reciprocal of the slope of the original line."

the opposite of -8 is 8 , and the reciprocal of this is 1/8

5 0
2 years ago
Read 2 more answers
Analysts determined that the $255,000 salary is an outlier. The box-and-whisker plot for the remaining data is shown. Describe t
bekas [8.4K]

Answer:

edge 2020

Step-by-step explanation:

The data appears slightly skewed, so the median is probably the most appropriate measure.

My friend has a good chance of making between $16,000 and $23,000 because that is the range for the middle 50% of employees.

8 0
2 years ago
Read 2 more answers
A glass ball is packed in the box shown. Which expression represents the volume of foam padding needed to fill the space in the
zhuklara [117]

Answer: (27- 4/3 pi) r^3

Step-by-step explanation: 1. Volume of a cube: V= a^3,  V= 3^3 , V=27

2.  Volume of a sphere: V=4/3 pi r^3 ......

5 0
2 years ago
A laser pointer in the shape of a cylinder is 13 centimeters long with a radius of 1 centimeter. On top it has a cone-shaped tip
bezimeni [28]
We know that

step 1
find the volume of a cylinder

volume of a cylinder=pi*r²*h
where
h=13 cm
r=1 cm
volume of a cylinder=pi*1²*13----> 13*pi cm³

step 2
find the volume of a cone

volume of a cone=(1/3)*pi*r²*h
where
r=1 cm
h=3 cm
volume of a cone=(1/3)*pi*1²*3-----> pi cm³

step 3
find the volume of the laser pointer

volume of the laser pointer=volume of a cylinder+volume of a cone
volume of the laser pointer=13*pi+pi-----> 14*pi cm³

the answer is
volume of the laser pointer is 14*pi cm³
4 0
2 years ago
All of the following expressions are equal to N except _____. |−N| −(−N) |N| −N
Maksim231197 [3]

Answer:

D. -N

Step-by-step explanation:

Our four given expressions are:

A. |-N|

B. -(-N)

C. |N|

D. -N

The | | symbols represent absolute value, which is the distance from the value within the two lines and 0; essentially since it measures distance, absolute value always outputs a positive value.

In choice A, we have |-N|, which means the distance between -N and 0. Well, the distance will simply be N, which is equal to N. Eliminate A.

In choice B, we have -(-N). Double negatives signal that they will cancel out to become positive, so -(-N) = N. Eliminate B.

In choice C, we have |N|, which means the distance between N and 0. This is clearly just N, so eliminate C.

In choice D, we have -N, which denotes "negative N". Clearly, "negative N" (-N) is not the same as "positive N" (N), so D is the answer.

<em>~ an aesthetics lover</em>

3 0
2 years ago
Read 2 more answers
Other questions:
  • A table factor of .7312 from a present value table of $1 means that a certain rate of interest for a certain period of time it w
    7·1 answer
  • 6q + 9 ≤ 9 and 6q + 9 ≥ −9
    6·2 answers
  • If sin 20 degree=a and cos20 degree=b then which of the following represents the correct value of sin 70 degree in terms of a an
    15·1 answer
  • Suppose that 1/2 of all cars sold at a Nissan dealer in a given year are Altimas, 1/3 are Maximas, and the rest are Sentras. Sup
    6·1 answer
  • Mrs.Steffen’s third grade class has 30 students in it. The students are divided into three groups(numbered 1, 2,and 3),each havin
    15·1 answer
  • What is the final amount if 865 is decreased by 16% followed by a 14% increase?
    14·1 answer
  • An automobile manufacturer produces production parts with 98% accuracy. What is the probability that in a production run of 25 p
    14·1 answer
  • A homeowner is building a circular fire pit in his backyard. He plans to outline the pit with bricks and cover the space inside
    7·1 answer
  • Students in the marching band are choosing new colors for the hats and the pants of their
    11·1 answer
  • A process engineer is implementing a quality assurance system on a breakfast cereal production line. A new sensor is installed o
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!