Answer:
n = 3
Step-by-step explanation:
-6n - 20 = -2n + 4 (1-3n)
First distribute the 4 (1-3n)
-6n - 20 = -2n + 4 - 12n
Combine like terms on the right side
-6n - 20 = -14n + 4
Get 'n' on one side by adding -6n to both sides
-20 = -8n + 4
Subtract 4 to both sides
-24 = -8n
Divide -8 to both sides
3 = n
12 cheesecakes
125 wedding guests
125 divided by 12=10.41666666666667=10.4
Answer:
Your answer is the first point
A reflection across the x-axis and then a transformation of -6 and 1.
<span>Simon
has 5 employees, each works 6 4/15 hours per day
First, let’s convert the fraction into decimals
=> 6 4/15 = 94/15 or 6.27 hours
=> 31.33 … repeating decimals.
now, let’s convert this decimals to fraction
=> 31.33 = 31 1/3
Thus, the answer is D. 31 1/3, the total number of hours that his employees
works per day.</span>
Answer: Expected value of the daily cost of operating the machine is 235.264.
Step-by-step explanation:
Since we have given that
E[x]= 0.96 repairs per day
And Var[x] = 0.96 repairs per day.

![E[c]=160+40E[x^2]\\\\E[c]=160+40(Var[x]+(E[x])^2)\\\\E[c]=160+40(0.96+0.96^2)\\\\E[c]=235.264](https://tex.z-dn.net/?f=E%5Bc%5D%3D160%2B40E%5Bx%5E2%5D%5C%5C%5C%5CE%5Bc%5D%3D160%2B40%28Var%5Bx%5D%2B%28E%5Bx%5D%29%5E2%29%5C%5C%5C%5CE%5Bc%5D%3D160%2B40%280.96%2B0.96%5E2%29%5C%5C%5C%5CE%5Bc%5D%3D235.264)
Hence, Expected value of the daily cost of operating the machine is 235.264.