Answer:
the probability that the project will be completed in 95 days or less, P(x ≤ 95) = 0.023
Step-by-step explanation:
This is a normal probability distribution question.
We'll need to standardize the 95 days to solve this.
The standardized score is the value minus the mean then divided by the standard deviation.
z = (x - xbar)/σ
x = 95 days
xbar = mean = 105 days
σ = standard deviation = √(variance) = √25 = 5
z = (95 - 105)/5 = - 2
To determine the probability that the project will be completed in 95 days or less, P(x ≤ 95) = P(z ≤ (-2))
We'll use data from the normal probability table for these probabilities
P(x ≤ 95) = P(z ≤ (-2)) = 0.02275 = 0.023
So the tower is going to be larger than the shadow but not to large so let work from there and not to large so the only logical answer is d
The last selection should be your answer
Speed times time=distance
distance=6.8
speed=2.72
time=?
2.72 times ?=6.8
divide both sides by 2.72
?=2.5
answer si 2.5 hours