John has the highest direct labour costs of <span>$1548.80. Obtain the number of hours worked by multiplying the number of hours available by the percentage of time that is not personal time. Obtain the proportion of overhead rate by multiplying the percentage of overhead rate by the rate in dollars per hour. Finally, multiply the two products obtained to get direct labour costs for each individual.</span>
360 - 250 = 110
m<1 = 110/2 = 55
answer
55
Remember
xyz=(x)(y)(z)
if x and y and z are all perfect cubes, xyz is also a perfect cube
remmeber
(x^n)^m=x^(mn)
so if it is perfect cube it can be factored into
(x^n)^3, such taht n is a whole number
basiclaly, see if the expoent is divisble by 3
all of them should be perfect cubes
215x^18y^3z^21
split them up to see which ones need changing
215=5*43, not a perfect cube
could be changed to 6^3, which is 216
x^18=(x^6)^3
y^3=y^3
z^21=(z^7)^3
the 215 needs to be changed
A product is the answer that you get when you multiply numbers together. So for this problem, you have 2 groups to multiply together. Since I cannot show a square or cubed x, I will put an x2 for x squared and an x3 for x cubed. You have to multiply each number in the first parentheses by each number in the second parentheses. Then combine any like sets.
(8x-3)(x2-4x+8)
8x3-32x2+64x-6x+12x-24
8x3-32x2+70x-24
So the answer is 8x cubed minus 32x squared plus 70x minus 24. Whew! That's a long one. Hope I didn't miss anything.