answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
MrRissso [65]
2 years ago
13

Equation with parentheses help​

Mathematics
1 answer:
hjlf2 years ago
8 0

Answer: t=9

Step-by-step explanation:

You might be interested in
Possible values for the area A of the rectangle shown are 12 ≤ A ≤ 36. Write and solve a compound inequality to find the possibl
Aleks04 [339]

Answer:

x can take any value and are viable in this situation if and only if it is a positive number

Step-by-step explanation:

We know that the area of a rectangle is given by:

A = x * y

So if we replace we have:

12 ≤ x * y ≤ 36

We divide by y, and we have:

12 / y ≤ x ≤ 36 / y

Which means that the value of x depends on y, that is to say if y is worth 1, the inequality would be:

 12 ≤ x ≤ 36

In the event that y is equal to 2:

 12/2 ≤ x ≤ 36/2

 6 ≤ x ≤ 18

Which means, that depending on y, x can take any value and are viable in this situation if and only if it is a positive number.

6 0
2 years ago
The length of the 2 black rods is equal to that of the 3 grey rods. The length of the white rod is equal to the total length of
Tpy6a [65]

Answer:

Its C!

Step-by-step explanation:

hmu if you need anything els

3 0
1 year ago
There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2. what is the probability tha
Anit [1.1K]

Standard deviations of the four activities of the critical path are 1,2,4,2.

Standard deviation of this critical path = Sum of square root of variance of this corresponding critical path

Standard deviation of critical path =\sqrt{1^2+2^2+4^2+2^2}

=\sqrt{1+4+16+4}

=\sqrt{25}

=5

Now we need to find the probability that the project will completed in 38 weeks given that its expected completion time is 40 weeks.

That is, we need to find P(X<38) :

z=\frac{38-40}{5}= \frac{-2}{5}=-0.4

P(X

Probability =0.5-0.16=0.34

Thus the probability that the project will be completed in 38 weeks is 0.34.

8 0
2 years ago
Read 2 more answers
Suppose you were exploring the hypothesis that there is a relationship between parents’ and children’s party identification. Wou
alukav5142 [94]

Answer:

No

It could be purely due to chance.

Step-by-step explanation:

A population is defined as the whole group which has the same characteristics. For example a population of the college belongs to the same college . But a sample may be an element of a population.

So it is not necessary for a population to have the same characteristics as the sample.

But it is essential for the sample to have at least one same characteristics as the population.

So we would not be correct in inferring that such a relationship also exists in the population.

It is a hypothesis which can be true or false due to certain conditions or limitations as the case maybe.

For example in a population of smokers some may be in the habit of taking cocaine. But a sample of cocaine users does not mean the whole population uses it.

It could be purely due to chance if we find out that there is a relationship between parents’ and children’s party identification in the population.

7 0
2 years ago
In studying the insurance preferences of homeowners the following conclusions are made: A homeowner is three times as likely to
Ede4ka [16]

Answer:

0.632

Step-by-step explanation:

Given that a homeowner is three times as likely to purchase additional jewelry coverage as additional electronics coverage

If probability of purchasing additional electronics coverage = p, then prob of purchasing jewelry coverage = 3p

The two events are independent hence joint probability is product of these two.

i.e. P(both) = p(3p) =3p^2

This is given as 0.2

3p^2 =0.2\\p = 0.258

the probability that a homeowner purchases exactly one coverage.

=P(AUB)-P(A \bigcap B)

= Prob he purchases I + prob he purchases II-2(prob he purchases both)

= 0.258+3(0.258)-2(0.2)\\=0.632

5 0
2 years ago
Other questions:
  • Describe a situation that could be modeled with the ratio 4:1
    6·2 answers
  • A cake shop bakes a variety of brownies. The top-selling brownies are ones with toppings of chocolate chip, walnuts, or both. A
    10·2 answers
  • The diagram below shows 5 identical bowls stacked one inside the other. The height of 1 bowl is 2 inches. The height of 5 bowls
    10·1 answer
  • What divisor is represented by the synthetic division below?
    6·2 answers
  • If $a$, $b$, $c$, and $d$ are replaced by four distinct digits from $1$ to $9$, inclusive, then what's the largest possible valu
    11·1 answer
  • A men's softball league is experimenting with a yellow baseball that is easier to see during night games. One way to judge the e
    13·1 answer
  • Each of the three oldest children sleeps in a twin bed. They all need bed sheets. A brand of sheets is on sale for “Buy one get
    6·1 answer
  • A system of equations has 1 solution. If 4x - y = 5 is one of the equations, which could be the other equation?
    15·1 answer
  • The probability that Stu buys a sandwich is 0.5.
    7·1 answer
  • Using calculus, it can be shown that if a ball is thrown upward with an initial velocity of 16 ft/s from the top of a building 7
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!