It is given in the question that
The temperature measured in Kelvin (K) is the temperature measured in Celsius (C) increased by 273.15. This can be modeled by the equation

To solve for C, we need to get rid of 273.15 and for that we do subtraction, that is

Correct option is the first option .
Answer:
<em>6 days</em>
<em></em>
Step-by-step explanation:
Let the time taken by Carpenter working alone =
days
Then time taken by apprentice alone = Twice as that of taken by Carpenter = 2
days
Time taken working together = 2 days
Work done in one day working together = 
Work done in one day by Carpenter working alone = 
Work done in one day by apprentice working alone = 
Work done in one day by Carpenter working alone + Work done in one day by Carpenter working alone =
+
= Work done in one day working together = 

Time taken by Carpenter alone to complete the work = 3 days
Time taken by Apprentice alone to complete the work = 3
2= <em>6 days</em>
Answer:
The answer is (D) ⇒ a = 11.71 , b = 15.56
Step-by-step explanation:
* In ΔABC
∵ m∠A = 45°
∵ m∠B = 110°
∴ m∠C = 180 - 45 - 110 = 25°
By using the sin Rule
∵ a/sin(A) = b/sin(B) = c/sin(C)
∵ c = 7
∴ a/sin(45) = b/sin(110) = 7/sin(25)
∴ a = (7 × sin(45)) ÷ sin(25) = 11.71
∴ b = (7 × sin(110)) ÷ sin(25) = 15.56
∴ The answer is (D)
Answer:
F
Step-by-step explanation:
s²+s²=(4√2)²
2s²=32
s²=16
s=4