Answer:
x=9,-1 and 
Explanation:
we have been given with the quadratic equation 
we compare the given quadratic equation with general quadratic equation
general quadratic is 
from given quadratic equation a=1,b= -8,c= -9
substituting these values in the formula for discriminant 

Now, to find the value of x
Formula is 
Now, substituting the values we will get

And rewritting the given equation by shifting 9 to right hand side of the given equation and taking minus inside the bracket so as to convert it in the form of

The lines y=x+2 and y=x are parallel, because they have the same slope.
Thanks for sharing my guy, very cool
Answer:
i feel as if in the United States, both the metric system and the English system of measurement are used, although the English system predominates. This discussion question has three parts:
Look around you to find something in the U.S. that is measured in metrics. Describe it to the class.
Give an example of how you think the metric system will be used in your future career.
Do you think the U.S. should switch to metric system exclusively? Why or why not?
This week we learned about the metric and U.S. customary measurement systems. Please upload and submit your responses to the following questions in at least 150 words:
In reflecting on both measurement systems, what did you find most important?
Explain how both measurement systems could relate to your life, community, or current/future career.
Expert Answer
Step-by-step explanation:
Answer: 52.94
Step-by-step explanation:
Length of train A = 480m
Tunnel length = 1320m
Time taken to cross tunnel = 2 mins = 120sec
Length of train B = 420m
Train B is slower than train A
Difference between their speed = 18km/hr
18km/hr = (18×1000)/3600 = 5m/s
Speed of train A :
Speed = distance / time
Speed = 1320 / 120 = 11m/s
Therefore, speed of train B :
(11 - 5)m/s = 6m/s
Relative speed of the two trains is therefore;
(Speed of A + speed of B)
Note : they are moving in opposite direction
( 11 + 6)m/s = 17m/s
Therefore time taken to cross each other :
(Sum of the length of both trains / relative speed of the trains)
Time taken = (480m + 420m) / (17m/s)
Time taken = 900m / 17m/s
Time taken = 52.94s